1¡¢wood stripping installation English before use before site formation, conditions can be hardened. To steady the device is placed, install directions according to the actual situation of space and raw materials to determine.
2¡¢check circuit, circuit to verify that a secure connection, Department chain, the tension of v-belts as well as the transfer, during use always check at a later time.
3¡¢debarker a wire stripping knife blades for steel products, after a long time after use if wear or change the angle, loosen the blade fastening screw, remove the blades for sharpening and adjustment, excessive wear should be replaced when the new blade of the same specifications.
4¡¢access the power from the switch box or switch cabinet access 380V three-phase power supply, first check whether the equipment around the impact debris and tree branches and running operations, power make sure feeding rollers rotation directions make the device run for 5 minutes or so, attention to listening and observation equipment is no exception.
5¡¢trial runs initially based on small, medium and large models were selected within the working range of the length of 2-4 meters than straight material testing machine, try to avoid using special hardwood and raw material testing machine of large diameter and curved.
6¡¢and feeding Shi to hands clenched raw materials, first will raw materials of tail elevation makes front-end Xia pressure supporting material roller entered into material roller, to out material roller end has will wood clip holding live and began out material Shi can release hands, received material personnel application hands supporting live wood Shun its out material direction moved, especially to wood will stripping finished and all and out material roller from Shi to master good balance.
7¡¢used when you want to first check the running direction of host and feeding systems, check the control handles operation of the hydraulic system is flexible, lift for easy synchronization, the fuel tanks, electro-hydraulic hand pumps, pump pressure is within the scope of the provisions, accumulator circuit valves in accordance with the requirements of the Department in the open or closed.
8¡¢should pay attention to equipment and personal safety during the operation, transportation while the system is running in addition to operating the hydraulic system adjust elevator may not be artificial to adjust the bench of wood, so as to avoid risk of injury or wounding.
9¡¢should always check the wood debarker parts, if any exceptions should be processed in a timely manner or to be replaced.